Dandenong VIC 3175 / Australia wide

As-built drawings from your site records and mark-ups.

SolidCAD updates and redraws as-built drawings from the information your team supplies: site records, marked-up drawing sets, measurements, photos and confirmed changes. You receive clean, editable CAD files and PDF sets, with a fast turnaround.

Request a quotation
Illustrative architectural drawings and model
Illustrative service image

Scope and deliverables

As-built drafting deliverables.

01

As-built updates to existing CAD

Incorporate confirmed site changes and red-line mark-ups into your existing drawing set.

02

PDF and paper to CAD

Redraw scanned, PDF or paper drawings as editable DWG files. Read our PDF to CAD guide.

03

Structural and steel as-builts

Record the installed steel and structural details for handover and future works.

04

Point cloud to model

Where you have laser scan data, see our scan to BIM services.

What to send

Clear records make accurate as-builts.

Send the latest drawing set, marked-up changes, site measurements or survey information, photos and the intended use of the as-built drawings. We draft from the information supplied and will raise any gaps during the scope review before drafting begins.

Do you visit site to measure?

We prepare as-built drawings from the records and measurements your team or surveyor provides. Tell us what information is available and we will confirm what can be documented.

Which file formats do you deliver?

Editable CAD files such as DWG, together with PDF review and issue sets. Include any title block templates or layer standards you need us to follow.

Frequently asked questions

As-built drawings:
your questions answered.

What is an as-built drawing?

An as-built drawing records what was actually constructed or installed, including any changes made on site compared with the original design drawings. It is used for handover, maintenance and future works.

What is the difference between construction drawings and as-built drawings?

Construction drawings show the design that was planned before work started. As-built drawings are updated after construction to show the final, as-installed condition, including approved changes and site variations.

Who is responsible for as-built drawings?

Responsibility is set by the project contract. Usually the builder or contractor records changes during construction, and the as-built set is prepared from those records. SolidCAD prepares the drawings from the information your team supplies.

Can you turn marked-up PDFs into as-built CAD drawings?

Yes. Send the latest drawing set with red-line mark-ups, measurements and photos, and we will update or redraw it as editable CAD files with PDF sets.